Lakebay Marina Redevelopment
Current Lakebay Announcements
- Legislature allocates $506,000 in new funding for 2024/2025.
History |
Project Information |
|
|
|
|
|
Engage |
Partners |
|
|
|
|
History of Lake Bay
Lakebay Marina is located on Key Peninsula in Pierce County, across the water from Penrose Point State Park in Mayo Cove, with picturesque views of Mount Rainier. This is an underserved, strategic location for recreational boaters between Olympia and Tacoma.
In its current condition, the site is not capable of meeting the needs of recreational enthusiasts. The facilities are closed to visitors and the docks have been removed due to safety risks.
In 2021, the Washington State Department of Natural Resources (DNR) in partnership with the Recreational Boaters Association of Washington (RBAW's) Marine Parks Conservancy purchased the marina with funding from the Recreation and Conservation Office (RCO), the Washington State Department of Commerce, and Pierce County.
The redevelopment of this marina is pivotal to preserving public access at this site and its rich history. Lakebay Marina dates back to 1884, when the pier was built for small cargo ships and servicing the renowned Mosquito Fleet. The site also housed an egg and poultry cooperative, which sustained the economy of the Key Peninsula during the Great Depression.
There is a tremendous opportunity to restore this marina and make it publicly accessible for a wide range of recreational activities. Additionally, there is significant potential to restore and protect habitat and water quality in Mayo Cove, which is a pocket estuary with kelp, and eelgrass that supports rearing salmon, Pacific herring, and numerous shellfish species. The preservation and redevelopment of Lakebay is cited in Pierce County's growth management plan.
The egg and poultry cooperative building is on the Pierce County Register of Historic Places. This project will evaluate the potential and cost for relocating and preserving the building, if possible.
Project Information
Greetings Lakebay Marina community –
So far, 2026 has been a year of behind-the-scenes advancement and many successes at Lakebay Marina.
DNR has made steps forward in assessing potential contamination found while removing the underground storage tank (UST) last year. We discovered that the tank had been leaking into the soil at the site and to move forward with work in that location, we needed to assess the extent of contamination and understand what type of remediation might be required.
The environmental consultants, Maul Foster and Alongi (MFA), conducted sampling in April 2026, to determine the extent of potential contamination. Boreholes were drilled at six locations surrounding the excavation pit from the UST removal, ranging in depth from 15 to 20 feet below surface. Initial findings indicate that the contamination has not spread, and in fact, it has significantly diminished since removing the source of the contamination (the UST). MFA will have their final report with recommendations on next steps to DNR before the end of the year.
DNR is also working toward restoration of the natural shoreline along the bay. The shoreline restoration has achieved 90% design. DNR staff and the consultant team of Herrera and KPFF are finalizing details and permit revisions. Due to the fish window that prevents in-water work from February to July, construction is planned for July 2027. The work will include excavation along the shoreline, removal of the wood armoring and pilings, removal of the boat launch remnants, import of beach nourishment, new native plantings, and signage.
Permitting is underway for the pier removal. An historical architectural review has been conducted as required by the Department of Architectural and Historical Preservation. The removal will also undergo a Section 106 review by the US Army Corps as part of the permitting process. Removal of the pier will not impact the overwater Egg Co-op Building.
DNR identified available funds within our Derelict Structure Removal Program to move forward with a feasibility study this year, without needing to wait for additional project funding. DNR has selected the team of KPFF, Herrera, and Geo-Engineers to develop a feasibility study for future development. The firm will evaluate the site-specific conditions and propose three design alternatives with associated costs. This work will be completed by June 30, 2027.
As we look ahead to 2027 and the upcoming legislative session, DNR will be applying for future grants through the Recreation and Conservation Office and requesting legislative funds to continue work at Lakebay. While the state budget landscape looks challenging, we hope to find funding to complete restoration of the creek, remove the ecology block wall, remove the white house, add some parking, and install picnic tables to the grassy area.
Future Plans
This project provides many opportunities to increase the sustainability of a marina at this site.
These opportunities include:
-
Removing the bulkhead and restoring the shoreline
-
Removing creosote-treated wood and Styrofoam to reduce pollution
-
Installing grating to reduce shading
-
Landscaping adjacent uplands to support native species.
-
Improving the marina, docks, and public access points to restore opportunities for boating, sailing, kayaking, stand-up paddleboarding, swimming, crabbing, and more.
Engage
- Feel free to email lakebaymarina@dnr.wa.gov to be added to the list and receive future updates.
Partners
The Lakebay Marina Redevelopment project has the following key project partners:
- Washington Department of Natural Resources
- Recreation Boating Association of Washington, Marine Parks Conservancy
- Washington State Parks